|
|
TRADITIONAL METHODS
|
SUSTAINABLE METHOD
|
Traditionally, installing
infrastructure such as traffic signposts, street
furniture, grab-rails, bollards and traffic
lights resulted in damage to the newly laid
foundations and cost $300.00+ per item.
|
Istead of taking weeks
to install, and costing hundreds of thousands
of dollars, infrastructure can be installed
in literally seconds! Run cursor over picture
to see how easy it is to install items. Click
here for more details
|
|

|
|
Whenever an item was
impacted it caused further costly damage to
the foundations and cost another $300.00+ to
replace every time it was impacted.
This requires heavy labour
results in on-going damage and landfill and
contstant disturbance to public and traffic
flow.
|
When an item is impacted
there will be no damage to the brick-paving
or concrete foundations and items can be replaced
by 1 person in literally seconds!
No disturbance to the
public or traffic flow. Run cursor over picture
below to see how easy it is to remove items.
|
|
|
|
After twenty or so years most items require
replacing, costing another $300.00+ per item.
The cost over the life
of the development can be many millions of dollars,
each time causing further damage to the development.
|
All components re-usable.
The only cost for replacing an item is less
than 5 minutes labour (even for bollards).
No material costs for
generations. Saving millions and improving the
sustainability, safety and aesthetics of your
development.
|
|
|
|
|
|